Tirana International Airport "Mother Teresa"
Tirana International Airport "Mother Teresa" is the most important hub of transportation in Albania and the country's only international airport. In 2005, it was used by close on 785,000 passengers, 22 percent more than in the previous year. Since the 1990s, the airport has been developing positively, with above-average growth in passenger numbers. Since April 23, 2005, operational responsibility for the management of the airport has been in the hands of the newly established airport company Tirana Airport Partners SHPK (TAP). This follows the conclusion of the privatization agreement in October 2004. Within the framework of a BOOT concession, TAP will run the airport for the next 20 years. It has set itself the twin goals of optimizing the operation of the new airport and making it into one of Albania's most modern infrastructure facilities. The aim is to provide passengers and airlines alike smooth, reliable, first-class service. The construction measures have already been started. May 6, 2005, saw the laying of the foundation stone for the new passenger terminal and the new access road. In just two years' time, Tirana International Airport will have an entirely new look. The architecturally striking terminal will be able to handle more than one million passengers a year. The new facilities will be functional and provide exemplary support for Tirana's urban planning transformation.
General Information:
ICAO Code: LATI IATA Code: TIA
Elevation: 125 ft AMSL
Reference Point Coordinates: 41° 24' 53N / 19° 43' 14E
Runway orientation: North/South 36/18
Runway length: 2750m
Key features of the investment and set deadlines:
New passenger terminal: Spring 2007
New air cargo center: Spring 2007
New access road: Autumn 2007, depending on progress of expropriation process
New bridge on the existing airport access road: Spring 2007
New perimeter road: Spring 2007
New water supply and sewerage treatment plant: Spring 2007
New parking lot: Spring 2007
New airfield works (taxiways and drainage works): Spring 2007
Conversion of the existing terminal into an office building: Autumn 2007
Construction of new ATC tower: Spring 2007
Perspective of the projected airport system:
Map of the projected airport system:
Tirana Airport Partners will also:
Build new concrete approns that will comply with BS EN ISO-9000.
Repair D2 taxiway which strength shall never be below PCNe60.
Will reconstruct txy E, in order that it can serve Code D airplanes (those with wingspan up to 52m).
Expand the runway and build new taxiways and approns to accomodate all Code D airplanes.
If Code E airplanes (wingspan 52,01m-65m) will serve the airport the runway and txys will be expanded width wise to accomodate them.
With the first 18 monts of the concession TAP will pave D2 taxiway in bitum.
Txy E will expand from 18m to 23m to accomodate Code E aricrafts.
The equipment building that will house unused euqipment of the airport will be 7m tall and 25x15 in dimmension and will be located close to the appron.
A road wide 3,5m along the perimeter of the airport for security cars.
The airport fence will have a height of 2,4m.
A CCTV camera system will be placed along the perimeter.
A 5lux lighting system will be placed along the perimeter.
Parking lot near the new terminal with a capacity of 500 vehicles. 50% of it will be covered.
New lighting system for txy C, D2 & W.
Existing Terminal
Dimensions: 100m(L) / 50m(W) / 5.5m(H)
Existing tower (part of the terminal): 25m (H)
Capacity: 250.000 passengers per year
New Terminal
Dimensions: 130m (L) / 124m (W) / 12m (H)
Capacity: 1.000.000 passengers per year
Architect: Hin Tan
Photographs from constructions